Germany market
GDA says Germany has >1.5 GW in operation; Frankfurt ~1,274 MW.
Germany is Europe's largest national data-center market, with Frankfurt the dominant cluster.
AI infrastructure is a real-estate, energy and technology supply chain. Each layer below links to the players who control it.
AI infrastructure is a real-estate, energy and technology supply chain, not one asset class.
GDA says Germany has >1.5 GW in operation; Frankfurt ~1,274 MW.
Germany is Europe's largest national data-center market, with Frankfurt the dominant cluster.
CBRE reported Q1 2026 Frankfurt inventory of 1,222.5 MW and 5% vacancy.
Frankfurt has the deepest ecosystem but grid and planning constraints are severe.
CBRE says hyperscaler/neocloud power is increasingly found outside major city boundaries.
Large projects are moving 20-60km+ from traditional city-center clusters to substations with deliverable power.
Germany's four TSOs introduced a maturity-based connection process from 1 Apr 2026.
A megawatt is not valuable unless the connection is real, timed and technically usable.
Goodman reports a 6.4 GW global data-center power bank as of 30 Jun 2026.
Land + secured grid capacity + planning path + fiber is much more valuable than raw industrial land.
SEGRO is using powered-shell and fully-fitted models in Europe.
Developer delivers building and electrical/mechanical envelope; tenant/operator installs or controls IT fit-out.
Equinix, Digital Realty, NTT, CyrusOne, Vantage, Colt DCS, Data4 and others are core players.
Operator rents power, racks/cages/suites and connectivity to many customers.
Hyperscalers and neoclouds are driving large pre-lets in Europe.
Very large blocks of capacity leased to cloud or AI companies, often 10-100+ MW.
Deutsche Telekom's Munich Industrial AI Cloud uses ~10,000 NVIDIA Blackwell GPUs.
GPU-dense data center optimized for AI training/inference, usually with liquid cooling and very high rack power.
CoreWeave, Nscale, Nebius, Crusoe and Lambda are key names.
Specialist GPU-cloud providers buy/lease huge amounts of AI capacity without being traditional hyperscalers.
DE-CIX Frankfurt exceeds 18 Tbps peak and connects 1,000+ networks.
Cloud and AI workloads need fiber, peering, dark fiber and multiple carriers, not only electricity.
NVIDIA GB200 NVL72 systems are rack-scale, liquid-cooled systems.
Traditional enterprise racks may be ~5-15 kW; AI racks can be tens to >100 kW.
Germany's EnEfG has specific data-center energy-efficiency requirements.
PUE measures facility overhead; heat reuse and cooling design are increasingly important in Germany/EU.
Aligned changed hands at about $40bn EV in 2026.
Data centers are financed by real-estate equity, infrastructure equity, corporate balance sheets, banks and asset-backed/structured debt.
These are the components that turn property into digital infrastructure.
Every tab of the research sheet has a page on this site.
Research date: 2026-09-23 · Public-source working map. Verify live status before transaction use.